chefdave Posted January 11, 2014 Share Posted January 11, 2014 Hi for everyone who missed my earlier postings. I am back from a three day stay in hospital to sort left shoulder. appernally i broke it long time ago and sergeon has had to sort it out. chopped some bone out and smooth rough surface of bones. only thing is i cannot remember breaking it ????? off work for three weeks. so no work going to bedone on dolphin but rsearching and costing out repairs and up grades. Quote Link to comment Share on other sites More sharing options...
darrel Posted January 11, 2014 Share Posted January 11, 2014 Speedy recovery to you. Quote Link to comment Share on other sites More sharing options...
MontanaChinook Posted January 11, 2014 Share Posted January 11, 2014 Yikes! No fun. Out of work...all that time on your hands but you can't work on the camper! Too bad. But yeah, you can research and brainstorm. Quote Link to comment Share on other sites More sharing options...
stamar Posted January 12, 2014 Share Posted January 12, 2014 What is your list of things you want to do chef? Sorry to heat you were injured Quote Link to comment Share on other sites More sharing options...
chefdave Posted January 12, 2014 Author Share Posted January 12, 2014 Hi stamar list of things to do remove roof air con unit repair back wall where spare tyre mounts decorate kitchen replace exhaust seal all roof seams and replace trim where roof meets wall recarpet inside lengthen over cab bed remove shower get lpg heating/cooking system tested get electric hook up certified/tested get new cushions and have them recovered service engine in march replace front shocks remove split plywood from under floor walls and seal reseal all windows tint windows repaint roof and outside walls im sure there is more but this should keep me busy for most of spring and summer Quote Link to comment Share on other sites More sharing options...
chefdave Posted January 12, 2014 Author Share Posted January 12, 2014 Hi should of added when i go back to work im on light duties for 2 months :-( means no work on dolphin for minium of 3 months unless i can pull some favours on off friends. one specializes in aluminium and stainless steel fabrication so he can guide me on roof or carry out any nesscary repairs. Quote Link to comment Share on other sites More sharing options...
chefdave Posted January 12, 2014 Author Share Posted January 12, 2014 Hi corbin k yes have a list that will keep me busy along with kitchen diner in house that is going to have full make over. new floor, wall paper along with redesigned kitchen layout new lighting all 60square metres of floor space. Leave me no time for paid work lol :-) Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.