Jump to content

Recommended Posts

THE WALL PAPER WAS PEALING OFF A LITTLE SO WHILE I AM DOING CAB-OVER GOOD TIME TO DO BATHROOM TO.....

1ST.UN-BOLTED SINK FROM WALL (4 LONG BLACK SCREWS)

2ND.TOOK OFF WALL PAPER AND PANEL BOARD DOWN TO FRAME

FROM BACK WALL AND CORNER OF RIGHT SIDE WALL.

THE ROT WAS FROM OUTSIDE SEAL PEALING OFF

MY BROTHER AND I WILL START TO REPLACE ALL OUTSIDE SEALS AND PAINT-WATER SEAL ROOF IN JAN/FEB AS SOON AS TAX RETURN COMES IN...

AFTER CAB-OVER AND BATHROOM FIXED "DABOBAH" WILL BE DRY AND READY FOR THE GREAT OUTDOORS!

post-6388-0-34742100-1354376176_thumb.jp

post-6388-0-88846900-1354376263_thumb.jp

post-6388-0-74257900-1354376325_thumb.jp

post-6388-0-72323200-1354376362_thumb.jp

post-6388-0-33636000-1354376382_thumb.jp

post-6388-0-21459500-1354376457_thumb.jp

post-6388-0-84814100-1354376472_thumb.jp

post-6388-0-09270500-1354376483_thumb.jp

Link to comment
Share on other sites

  • 3 years later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...