brandwiller Posted July 10, 2011 Share Posted July 10, 2011 Please take a look at my camper renovation. It's located at the following address- http://rhinoplastycamper.blogspot.com/. I figured it would be easier to send the link then to upload all the pictures all over again. Things I have done so far: 1) Ripped out all carpet, drapes, and upholstery 2) Fixed soft spot on floor 3) Removed storage space to build bench 4) Repainted all walls 5) Repainted cabinets and added new hardware 6) Re-carpeted overhead bed 7) Waterproofed using Eternabond 8) Built new eating bench 9) Laminate flooring 10) Sewed new mattress cover 11) Sewed new drapes Things I still need to complete 1) Sew mattress cover for the other futon/bed 2) Sew cushion cover for bench 3) New lids for two vents 4) Redo bathroom and kitchen countertop Quote Link to comment Share on other sites More sharing options...
Dolphina Posted July 11, 2011 Share Posted July 11, 2011 Great work!! Keep it up and keep posting. Sue Please take a look at my camper renovation. It's located at the following address- http://rhinoplastycamper.blogspot.com/. I figured it would be easier to send the link then to upload all the pictures all over again. Things I have done so far: 1) Ripped out all carpet, drapes, and upholstery 2) Fixed soft spot on floor 3) Removed storage space to build bench 4) Repainted all walls 5) Repainted cabinets and added new hardware 6) Re-carpeted overhead bed 7) Waterproofed using Eternabond 8) Built new eating bench 9) Laminate flooring 10) Sewed new mattress cover 11) Sewed new drapes Things I still need to complete 1) Sew mattress cover for the other futon/bed 2) Sew cushion cover for bench 3) New lids for two vents 4) Redo bathroom and kitchen countertop Quote Link to comment Share on other sites More sharing options...
brandwiller Posted July 18, 2011 Author Share Posted July 18, 2011 (edited) I have completed the upholstery on the mattress and cushion cover. The barrel chair seat cover and two drapes are all that remain with sewing. The pictures are updated on the blog. Edited July 18, 2011 by brandwiller Quote Link to comment Share on other sites More sharing options...
brandwiller Posted August 10, 2011 Author Share Posted August 10, 2011 Here's an update to the camper renovation. We took it to Pismo Beach this weekend, and it worked beautifully. Obviously, there are some things that need to be updated, but it was a successful trip. I figured it would be easier to send the link then to upload all the pictures all over again. Things I have done so far: 1) Ripped out all carpet, drapes, and upholstery 2) Fixed soft spot on floor 3) Removed storage space to build bench 4) Repainted all walls 5) Repainted cabinets and added new hardware 6) Re-carpeted overhead bed 7) Waterproofed using Eternabond 8) Built new eating bench 9) Laminate flooring 10) Sewed new mattress cover 11) Sewed new drapes 12) Sewed mattress cover for the other futon/bed 13) Sewed cushion cover for bench 14) New lids (Maxxair Vents) for two vent lids 15) Redid bathroom and kitchen countertop 16) Fixed Trailer Hitch and added Cargo Carrier 17) MOST IMPORTANTLY- CONFIRMED THAT THE FRIDGE WORKS!!!!!!! Still to be done 1) Get a full inspection of the engine 2) Fix leek when flughing toilet 3) New plywood under pull out bed 4) Add "bag awning" when I can afford it 5) go........... Most renovations can be seen at http://rhinoplastycamper.blogspot.com (no, that's not a spam site, regardless of the name) Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.